Cool Milk
Commercial Office Space, Langworth
Client: Cool Milk
Architect: Studio G
A fabric-first approach was taken on this project, with walls constructed using a thin joint block system to maximise airtightness and thermal mass. The external vertical timber boarding reflected the character of agricultural buildings in the area, with a sacrificial plinth incorporated to minimise remedial work in the event of flooding.
Technologies were selected to complement the building's performance, including:
Air source heat pumps with MVHR (Mechanical Ventilation with Heat Recovery)
Solar PV array
Rainwater harvesting system
We delivered the construction of this two-storey sustainable office building, designed to sit within the footprint of an existing bungalow.